How do constraints related to manufacturing companies




















Eliyahu Goldratt in conjunction with his manufacturing scheduling software program. This early predecessor to the APS programs of today was designed to help factories determine where the weak links in their production chains were. According to Dr. Goldratt, the purpose of the program was to identify bottlenecks in the manufacturing process by analyzing the production data from multiple line runs.

By doing so, he believed that he could improve efficiency by correcting or improving the areas of a production facility that were identified as limiting the entire manufacturing process. For example, imagine a factory line that produces widgets an hour. Cycle Time Review equipment performance data to determine which equipment has the longest average cycle time.

Adjust out time where the equipment is not operating due to external factors, such as being starved by an upstream process or blocked by a downstream process. Demand Ask operators where they think equipment is not keeping up with demand. Pay close attention to these areas, but also look for other supporting indicators. Item Description Buffer Create a suitably sized inventory buffer immediately in front of the constraint to ensure that it can keep operating even if an upstream process stops.

Quality Check quality immediately before the constraint so only known good parts are processed by the constraint. Continuous Operation Ensure that the constraint is continuously scheduled for operation e. Maintenance Move routine maintenance activities outside of constraint production time e. Offload Internal Offload some constraint work to other machines.

Even if they are less efficient, the improved system throughput is likely to improve overall profitability. Offload External Offload some work to other companies.

This should be a last resort if other techniques are not sufficient to relieve the constraint. Priority Subordinate maintenance to the constraint by ensuring that the constraint is always the highest priority for maintenance calls. Sprint Add sprint capacity to non-constraint equipment to ensure that interruptions to their operation e. Steady Operation Operate non-constraint equipment at a steady pace to minimize stops. Frequent inertial changes i. Item Description Performance Data Use performance data e.

Top Losses Target the largest sources of lost productive time, one-by-one, with cross-functional teams. Reviews Implement ongoing plant floor reviews within shifts a technique called Short Interval Control to identify tactical actions that will improve constraint performance. Setup Reduction Implement a setup reduction program to reduce the amount of productive time lost to changeovers. Equipment Purchase additional equipment to supplement the constraint a last resort.

Item Description Constraint Broken If the constraint has been broken the normal case , recognize that there is a new constraint. Finding and eliminating the new constraint is the new priority restart at Step One. Constraint Not Broken If the constraint has not been broken, recognize that more work is required, and a fresh look needs to be taken, including verifying that the constraint has been correctly identified restart at Step One.

Eliminate waste. Focus Singular focus on the constraint until it is no longer the constraint. Broad focus on the elimination of waste from the manufacturing process. Result Increased manufacturing capacity. Reduced manufacturing cost. Inventory Maintain sufficient inventory to maximize throughput at the constraint. Eliminate virtually all inventory. Line Balancing Create imbalance to maximize throughput at the constraint. Create balance to eliminate waste excess capacity.

Pacing Constraint sets the pace Drum-Buffer-Rope. Customer sets the pace Takt Time. Provides a foundation from which to work when identifying the constraint. For example, the cycle time of each stage can be marked on the map. Engages teams and useful for problem solving exercises. Helpful for documenting complex processes. Gemba Gemba encourages leaving the office to spend time on the plant floor. This promotes a deep and thorough understanding of real-world manufacturing issues — by first-hand observation and by talking with plant floor employees.

Walking the plant floor, observing production, and interacting with employees can be a very effective way to gather information that helps identify the constraint. Lean Tool Description 5S 5S is a program for eliminating the waste that results from a poorly organized work area. It consists of five elements: Sort eliminate that which is not needed , Straighten organize the remaining items , Shine clean and inspect the area , Standardize create standards for 5S , and Sustain consistently apply the standards.

Creates a foundation for better performance at the constraint. Enables faster identification of emerging issues at the constraint. Results in increased motivation and pride from the improved work environment. Andons are visual displays that indicate production status and enable operators to bring immediate attention to problems — so they can be instantly addressed. Displays constraint production metrics in real time — a powerful motivator.

Reduces reaction time to stoppages by instantly alerting operators to intervene. Empowers operators to call immediate attention to problems at the constraint.

Increases focus by using visuals to reinforce the importance of the constraint. Standardized Work Standardized Work captures best practices in work area documents that are consistently applied by all operators and that are kept up-to-date with the current best practices. Improves throughput by consistently applying best practices at the constraint. Reduces variation by applying standardized procedures at the constraint. Ensures that all operators setup and run the constraint in a repeatable way.

Kaizen Kaizen provides a framework for employees to work in small groups that suggest and implement incremental improvements for the manufacturing process. It combines the collective talents of a company to create an engine for continuous improvement. Provides a proven mechanism for generating ideas on how to exploit the constraint. Engages operators to work as a team and to think critically about their work. Lean Tool Description Kanban Kanban is a method for regulating the flow of materials, which provides for automatic replenishment through signal cards that indicate when more materials are needed.

Offers simple visual techniques for controlling the flow of materials. Synchronizes material usage at the constraint with material usage in the upstream process by controlling when new materials are released into the process. Line Control Line Control is a sophisticated technique used with synchronous automated lines, such as FMCG Fast Moving Consumer Goods lines, which slaves non-constraint equipment to the constraint in such a way as to increase overall system throughput. Optimizes constraint and non-constraint running speeds to maximize throughput and reduce the frequency of minor stops.

Reduces startup delays on the constraint by synchronizing equipment startup. Lean Tool Description TPM TPM Total Productive Maintenance offers a holistic approach to maintenance that focuses on proactive and preventative maintenance to maximize the operational time of the constraint increasing up time, reducing cycle times, and eliminating defects.

Reduces the frequency of constraint breakdowns and minor stops. Enables most maintenance to be planned and scheduled for non-production time. Targets quality issues by finding and removing the root causes of defects.

As many steps as possible are converted to external performed while the process is running and remaining steps are streamlined e. Increases usable production time at the constraint. In what follows, we present two problems where TOC may be useful. In a manufacturing system consisting of an FMS and conventional cutting machines, it is necessary to divide the workload between these two subsystems. We start by introducing necesssary notation. The objective function 27 represents the net profit to be maximised.

The constraints reflect the capacity limitation of each machine. The constraints 29 ensure that production does not exceed demand for each part. The constraints 30 and 31 , guarantee the nonnegativity of the decision variables. Because of the capability of CNC machining centres to continuously perform a variety of operations on a part by automatically changing the cutting tools, such machining centres constitute CCRs in the manufacturing system in which they are inserted.

Consequently, their effective scheduling is critical to achieving maximum system perormance. Consider a CNC machining centre where it is required to determine the part mix to be machined and the corresponding tool set with a view to maximising net profit.

Now, we introduce necessary notation. The objective function 32 represents the net profit we wish to maximise. The constraints 33 ensure that each part is machined by exactly one tool or is not machined at all.

Tha constraints 34 ensure that all needed tools are loaded on the carousel. The constraints 35 reflect the tool carousel capacity limitation. Tha constraints 36 reflect the deterioration dynamics of the tools. The constraints 37 - 41 guarantee the decision basics as to tool replacement, resetting, or otherwise.

Finally, the constraints 42 guarantee the binary of the decision variables. For unbalanced manufacturing systems, TOC constitutes a useful strategy for maximising and improving system performance. We have shown that the operational research technique of mathematical programming provides a systematic basis for the implementation of TOC in practice.

A substantial scope exists for developing mathematical models of TOC in automated manufacturing systems and their validation in industrial practice. The author takes this opportunity to thanks the Brasilian Council of Research and Development CNPq for a scholarship to support this work. Open menu Brazil. Journal of the Brazilian Society of Mechanical Sciences.

About the journal Editorial Board Instructions to authors Contact. Open menu. Text EN Text English. Qassim About the author. Theory of Constraints; bottlenecks; manufacturing management. The Theory of Constraints in Manufacturing R. Qassim Department of Mechanical Engineering. Milwaukee, Wisc. Goldratt, Eliyahu M. The Goal. Great Barrington, Mass. What is this thing called Theory of Constraints and how should it be implemented?

Rother, Mike and John Shook. Learning to See. Brookline, Mass. Womack, James P. Lean Thinking. New York: Simon and Schuster, TOC, and Lean While both TOC and lean manufacturing focus on reduction of cost lean manufacturing emphasizes reduction of waste , there could be an alternate perspective in terms of time time-to-market — reducing lead times improving responsiveness of the organization to changes in the environment. The inherent assumption here is that the market is not really the constraint since a company can profit more by reducing time to market and also selling more products — increasing throughput.

From a TOC perspective, the objective of increasing throughput can be realized through reducing manufacturing lead times. Firms realize that the responsiveness in upstream activities such as manufacturing can be partially obscured by sluggish downstream activities. The advantages of using time as a weapon of competitive advantage as exhibited by the apparel industry in the US are:. TOC and Lean Thinking The first step to understanding world class business concepts is to recognize where the varied philosophies agree and where they differ from traditional mass production concepts.

The real breakthrough is teaching others to reject the concepts of traditional mass production which have become intuitive to us all. To undermine one or the other undermines the potential for a revolutionary breakthrough toward either. A key to fully understanding TOC is that it is not just a system of eliminating constraints bottlenecks but more a system of managing constraints. A truly enlightened organization will know exactly where it wants the constraints to be.

Constraints are a reality, the question is whether you want them to be internal, where you can control them or external i. A company that is in control of its own destiny can use its constraints like a valve to control and continually promote the flow of value. John L.

To do that, today, you need some right storage because your variation is not zero! So your buffers are more than 1 TOC and it seems to you that lean is different…. In my opinion TOC must be the way of facing the problems one by one, lean is the vision of what your firm would be, the tools you use are not so important if the way of thinking and the objective are clear! Its focus is to help people find the leverage points policies as well as physical constraints to continually improve Throughput.

The constant tuning of strategic buffers allows inventories to be kept at minimum levels. Al Posnack, President, Productivity Partners. In other words, you must tackle all three measures simultaneously, not optimize one whilst having a negative impact on the others. Another common theme is that non-bottlenecks do not have to work continuously, and that people can be freed up from non-bottleneck parts of the process. Again, this is very much in line with lean thinking. I believe there are some very fundamental misunderstandings of elements of both systems that need to be clarified.

Without clarification on these points, implementers of either Lean or TOC, or both of these approaches will have problems sooner or later. First of all. Contrary to the paper conclusion on the web site e. Bob Elder, Chesapeake Consulting, Inc. I agree with the conclusion that TOC and Lean have many similarities and that these similarities are much more important than their differences. I would like to point out however, two points where I disagree. First, in the article, the author defines TOC as focused on local action, it should be pointed out that the core question TOC grapples with is how to reconcile local action with global optimization.

TOC contends that by focusing on the constraint is the only way you can be sure that your local action will have the positive impact on global performance. I believe this point gets lost in the table in the article. My second disagreement is with one of the written comments after the article. True, TOC does advocate buffers inventory at selected points to ensure that neither the constraint nor the customer is left waiting.



0コメント